Maison > produits > Bâtiments préfabriqués de ferme >
Metal Steel Structure Layer Brioler Chicken Prefab Poultry Farm Building

Metal Steel Structure Layer Brioler Chicken Prefab Poultry Farm Building

prefab poultry farm building

steel structure chicken coop

metal layer broiler house

Lieu d'origine:

CHINE

Nom de marque:

China CT

Certification:

ISO CE

Numéro de modèle:

Bâtiments préfabriqués de ferme

Causez Maintenant
Demandez une citation
Détails du produit
éclairage:
LED ou fluorescent
Installation:
Bricolage ou professionnel
Résistance à la corrosion:
Fort
Type de fenêtre:
Fenêtre en alliage en aluminium
Formulaire de connexion:
Connexion du boulon
Traitement extérieur:
Peint ou galvanisé
fenêtre:
Single ou double accroché
Fabrication:
personnalisé
Étanche:
membrane de PVC
Dimensions:
personnalisé
Modèle:
Ferme
Fondation_type:
Béton
Mettre en évidence:

prefab poultry farm building

,

steel structure chicken coop

,

metal layer broiler house

Conditions de paiement et d'expédition
Quantité de commande min
² de 500M
Prix
USD 30-250 / M²
Détails d'emballage
emballage standard
Délai de livraison
15-20 jours
Conditions de paiement
T / t, l / c
Capacité d'approvisionnement
400000 tonnes par an
Description de produit

Metal Steel Structure Layer Brioler Chicken Prefab Poultry Farm Building

 

Product Uses of Metal Steel Structure Layer/Broiler Chicken Prefab Poultry Farm Building‌
Poultry Farming‌: Designed for layer chickens and broilers, providing a controlled environment for efficient breeding, feeding, and heat preservation.
Automated Farming‌: Supports integration with automatic feeding, ventilation, and waste management systems for large-scale operations.
Multi-Tier Housing‌: Features tiered designs (4–5 tiers) to maximize space utilization in high-density farming.
Livestock & Agricultural Use‌: Adaptable for pig, cow, or sheep housing with modular configurations.
Key Advantages‌
Durability & Longevity‌: Hot-dip galvanized steel or painted surfaces ensure a lifespan of ‌50+ years‌ with resistance to corrosion and extreme weather.
Customization‌: Flexible design options for dimensions, insulation (EPS/PU/rock wool), and automated equipment integration.
Quick Installation‌: Prefabricated bolt/welded connections reduce construction time by ‌30–50%‌ compared to traditional methods.
Safety & Compliance‌: Meets ‌ISO, CE, and ASTM‌ standards with fireproof, earthquake-resistant, and wind/snow load-resistant structures.
Cost-Effective‌: Lower maintenance and energy costs due to thermal insulation (e.g., sandwich panels) and recyclable materials.

 

Metal Steel Structure Layer Brioler Chicken Prefab Poultry Farm Building 0

Metal Steel Structure Layer Brioler Chicken Prefab Poultry Farm Building 1

Metal Steel Structure Layer Brioler Chicken Prefab Poultry Farm Building 2

 

Metal Steel Structure Layer Brioler Chicken Prefab Poultry Farm Building 3

Metal Steel Structure Layer Brioler Chicken Prefab Poultry Farm Building 4

FAQ
1. You are manufacturer or trading company?
We are a manufacturer. And welcome to visit us at any time. The quality control flow and sales team will show you
our professionalism. Also you will can get best and most competitive price after visiting us.

2. Is your price competitive compared with other companies?
Our business objectives are to give the best price with best quality. We will do everything we can to reduce your cost and guarantee you get the best product that you paid for.

3. Can you send engineers or whole team to install my project?
We will give detailed installation drawings for free. We can send engineers as installation director or a team upon request.

4. Do you accept container loading inspection?
You are welcomed to send an inspector, not only for the container loading, but any time during the production time.

5. Do you offer designing service for us?
Yes, we could design full solution drawings as your requirements. By using AutoCAD, PKPM, MTS, 3D3S, Tarch, Tekla Structures (Xsteel) and etc. we can design complex industrial building like office mansion, super market, auto dealer shop, shopping mall, 5 star hotel.

6. What is the delivery time?
Delivery time depends on order quantities. In general the delivery time to nearest seaport in China will be 40 days after
receiving deposit.

Envoyez votre demande directement à nous

Politique en matière de protection de la vie privée Bonne qualité de la Chine Atelier de construction en acier Fournisseur. © de Copyright 2025 China CT Steelstructure Co.,Ltd . Tous droits réservés.